Skip to main content
5.0 from 30 reviews 0474 788 857
Sure Sight Inspections logo
Guide · Reading The Report

The Building And Termite Inspection Report, Explained.

A building and pest inspection report is a photographed, section-by-section record of a property's condition, with each finding rated by severity and the areas that could not be reached stated with the reason. Here is what the sections mean, how to read the ratings, what the termite report covers, what 'not inspected' really means, and what to do with it.

From Sure Sight Inspections: Ibrahim Durdu, a licensed builder trained in timber pest inspection, with 10 years in the trade, based in Smithfield, covering Greater Sydney. We inspect and report. We don’t sell repairs or treatment.

Illustrative: reading a property inspection report on a tablet at a desk
Illustrative image. Real defect photographs from Sure Sight inspections are added as they are supplied.

What a building and pest inspection report looks like, section by section

A report to this standard typically contains, in this order:

  1. Summary. The findings that matter, sorted by severity, on 1 or 2 pages. If you read nothing else, read this.
  2. Property details. Address, date, weather (it matters for moisture readings), who attended, the construction type and era, and whether the property was furnished or occupied.
  3. Access limitations. Every area that could not be inspected, and why: no manhole into the roof void, subfloor clearance under the safe minimum, a locked shed, stored goods against a wall. Read this section before the findings, not after.
  4. Findings by area. Roof exterior, roof void, external walls, subfloor, interior room by room, wet areas, site and drainage, outbuildings. Each finding with a photograph, a rating and a plain note on what it is and what to do.
  5. Timber pest findings. The separate report under AS 4349.3-2010: activity, damage, conducive conditions, areas not inspected.
  6. Photographs. Inline with each finding, not dumped in an appendix.
  7. Recommendations. Which specialist to consult for which finding, and what to do next.

Reading the severity ratings: major, minor, safety hazard

Severity ratings in a building inspection report and what each means for a buyer
RatingWhat it meansWhat to do
Major defectNeeds substantial work to fix, or affects the structure's performance, safety or the use of the building. A failed roof, a moving footing, live termites in framing, a shower leaking into the floor below.Get the specialist's opinion and a price inside your cooling-off period, then negotiate or walk with your conveyancer.
Minor defectMaintenance or cosmetic: cracked render, a dripping tap, a blocked gutter, worn paint, a sticking window. The bulk of most reports.Note the cost of the list as a whole; no single item changes the decision.
Safety hazardA risk to people regardless of cost: a missing balustrade, an unsafe switchboard, a trip hazard, a loose step, a non-compliant pool barrier.Price the fix and plan it for before you move in.
Further investigationSomething the visual inspection can see the symptom of but not the cause: movement that needs an engineer, a wet area that needs a plumber's test.Book the specialist named. Do not treat it as 'probably fine'.

The failure mode in this trade is padding: a report that lists 60 items and buries the 2 major ones on page 40 so the inspector looks thorough. Buyers punish it in reviews and they are right to. The summary page exists so the major items are impossible to miss.

Reading the termite inspection report

The timber pest section is a separate report under a separate standard, and it answers 4 questions.

  • Is there live activity? Workings, live insects, fresh mud leads, and where.
  • Is there damage, current or historic, and to what: framing, flooring, skirtings, outbuildings.
  • What are the conducive conditions? Moisture, timber in ground contact, garden beds against brick, blocked subfloor vents, stored timber. These are the findings that prevent the next colony, and they are cheap to fix.
  • What could not be inspected, and why.

Then a recommendation. Because we inspect and do not treat, the recommendation is a next step, not a sale: a licensed pest manager for treatment if there is activity, a fix for the conducive conditions either way, an annual inspection interval. If you take the report to a pest manager, the questions to put to them are: which species, where the activity is, which method they propose and why, what ongoing monitoring they recommend, and what their warranty covers. The 8 signs a buyer can spot are in the signs of termites guide; the scope of the inspection is on the termite inspection page.

Want A Report That Leads With What Matters?

Photographed, rated, summary first, the same day. And the person who wrote it answers your questions on it.

Access limitations, and what they really mean

“Inaccessible” is the word the 1-star reviews attack, and they attack it because it has been used as a con: an inspector who did not go under the floor writes “subfloor: not inspected, limited access” and the buyer finds the termites at settlement. So here is how to read the section. A limitation that names the area, the reason and the consequence is honesty: “roof void not entered: no manhole; recommend a manhole be cut and the void inspected before settlement” tells you exactly what you do not know and what to do about it. A limitation that names nothing (“some areas were inaccessible”) is the one to query. We inspect the roof void and the subfloor wherever there is safe access, and if we can't get in we say so in the report, and why. That sentence is on every service page of this site because it is the answer to the fear.

See a sample report, and why you should ask any inspector for one

The report is the product: you are buying the document. So here are 2 real ones, a 52-page pre-purchase building and pest report and a 35-page new home construction report, with the address and report number removed and every page watermarked. They tell you whether a report leads with the summary, photographs every finding and names its limitations. Only 2 of the 10 pages ranking for a Sydney building inspection offer anything like this, which says something about the other 8.

Real reports · Address removed · Watermarked

Download 2 real sample reports

Your details go to Sure Sight Inspections only. The download links appear here as soon as you submit.

Building and Pest Inspection Report (52 pages) · New Home Construction Inspection Report (35 pages)

Is there a building inspection report template?

People search for one hoping to inspect the house themselves and fill it in. There are templates, and the Australian Standards define what a compliant report contains, but a template is not an inspection. The value is not the headings; it is the roof void, the subfloor, the moisture readings and the builder’s call on whether a crack is cosmetic or structural, none of which a template supplies. Use the element table in the what a building inspection covers guide as your own checklist for the open home, and let the inspection do the 3 places you cannot: the roof, the roof void and under the floor.

Photos: what a good report photo shows, and what a bad one hides

A good report photograph locates the finding (the room, the wall, the position on it), shows the defect with something for scale, and is captioned with what it is and its rating. A bad one is a close-up of a crack with nothing else in frame, which could be any wall in any house. The difference matters most 6 months after settlement, when you want to prove the defect was there, and on a dilapidation report, where the photograph is the whole product. “Took a hundred photos” is a complaint in this trade, not a compliment: the count is meaningless if none of them can be found again.

What to do with the report: negotiate, get a specialist quote, or walk away

Lead with the summary. A major item goes to the specialist the recommendations name, for an opinion and a price. Then the report and the quote go to your conveyancer as a negotiating document, inside the cooling-off period if that is where you are: renegotiate, ask for repairs, ask for an extension, or rescind. The vendor is not obliged to agree to anything; the report makes the ask specific. The full version is the before or after the offer guide, and the clock is the cooling-off period guide.

Talking to the inspector: what to ask

The inspector who was on site, Ibrahim, is the person you talk to about the findings. After-report care is part of every inspection.Read the report first, then ask: which of these findings would change your decision if it were your money; which need a specialist and which need a tradesperson; what did you not see, and does it worry you; and is this house better or worse than the others of its age and type you inspect. Nghia Nguyen, Google review: “He took the time to answer all my questions, no matter how small, and helped me understand what each issue meant in practical terms.” That is the conversation the report is written to start.

Buying In Sydney? Get It Inspected First.

Building and timber pest in 1 visit, your report the same day, and a firm price before anything is booked.

Common Questions

Inspection Report FAQs.

What does a termite inspection report include?

Live activity and where, damage (current and historic), the conducive conditions that invite termites, the areas that could not be inspected with the reason, photographs of each, and a recommendation on the next step: a licensed pest manager if there is activity, the conducive conditions fixed either way, and an inspection interval. It is prepared to AS 4349.3-2010.

Can I get a sample building inspection report?

Ask when you enquire and we’ll send you one. Any inspector who will not show you a sample before you book is telling you something about the report.

How long is a typical report?

Long enough to photograph every finding and short enough to read. Length is not thoroughness: a report that lists 60 items and buries the 2 major ones is worse than one that leads with them. The summary page is the measure.

What does 'not inspected' mean?

That the inspector could not safely reach that area, and it should say why: no manhole, subfloor clearance under the minimum, a locked shed, stored goods. Named and explained, it is honesty; vague, it is the section to query. We inspect the roof void and the subfloor wherever there is safe access, and if we can't get in we say so in the report, and why.

Can I share the report with the agent or vendor?

It is your report; you can share it, and sharing the relevant pages is how the negotiation works. Whether to share all of it, and with whom, is worth a word with your conveyancer first.

What if I don't understand the report?

Ask. The inspector who was on site, Ibrahim, is the person you talk to about the findings. After-report care is part of every inspection. A report full of terminology is not much use when you are deciding whether to proceed on a house, and the plain explanation is part of the job.

Not A Fan Of Forms?

Prefer A Call Back?

Leave your name and number and we’ll call you back about your inspection. Pre-purchase, pre-sale, timber pest and dilapidation inspections across Greater Sydney.

Which inspection you need, if you know. Optional.

No obligation. Your number is only used to call you back.

CallBook Inspection